OPTIMAL PLANNING MODEL FOR REHABILITATION OF WATER NETWORKS
The test of five different models to plan the rehabilitation of water networks. Capital costs benefits and hydraulic reliability were used for making an optimal decision for the rehabilitation plan of a water pipe network. A multi-objective optimisation model is successfully developed in this study by using a new meta-heuristic algorithm. The proposed models provide more options for the rehabilitation of pipe network systems compared with previously suggested.
Accès au document
Statut: | Consulter le site de l'éditeur pour accéder à cet article
|
Cote DDD: | 67/26594 |