Chers partenaires et clients, venez découvrir notre nouveau site institutionnel

Surveillance écologique du site de production électronucléaire de Gravelines Novembre 2009 – Octobre 2010

This is the 33th annual surveillance report concerning the nuclear power plant of Gravelines. Its very high power level results from six plant units located on the shore and is characterised by a cooling system with a coastal surface input and output. The production of electricity began in 1980 and reached maximum in 1986. Surveys concern monitoring of pelagic system (hydrology, microbiology, phytoplankton, zooplankton), fish populations (larvae and eggs of Sole and Sprat) or crustaceans (shrimps), and benthic macrofauna (intertidal and subtidal). This survey deals with spatial and temporal approaches (i) study of the direct impact by comparison of the input and output seawater stations, (ii) study of medium and long term evolution of the area by comparison with a reference station.

Métadonnées du document